The approved development schemes included: Feasibility study, detailed design and preparation of PC-I for construction of housing units in housing scheme Chishtian (PC-II) at the cost of Rs2.917 million. Feasibility study, detailed design and preparation of PC-I for construction of housing units in housing scheme Lodhran (PC-II) at the cost of Rs3.120 million.
Feasibility study, detailed design and preparation of PC-I for construction of housing units in housing scheme Renala Khurd (PC-II) at the cost of Rs3.120 million.
Feasibility study for identification of potential touristic sites in Koh-e-Suleman Area (PC-II) at the cost of Rs21.349 million. Feasibility study for development of Kotli Sattian as a new tourist destination (PC-II) at the cost of Rs20.266 million. Feasibility study for establishment of tourist resort near Namal Lake, Tallagang Road, Mianwali (PC-II) at the cost of Rs13.830 million.