It would take delivery of the systems by 2018 for which 580 million euros ($629 million). She said the procurement was intended to bridge the period until a medium-altitude long-endurance unmanned aerial vehicle (UAV) being developed by France, Italy and Spain is operational, slated for 2025. The German military, which currently uses Israel's Heron 1, opted for the Heron TP over the Predator drone from the United States. Sources said the Heron TP would be available more quickly and would make for a smoother transition between models.
It would take delivery of the systems by 2018 for which 580 million euros ($629 million). She said the procurement was intended to bridge the period until a medium-altitude long-endurance unmanned aerial vehicle (UAV) being developed by France, Italy and Spain is operational, slated for 2025. The German military, which currently uses Israel's Heron 1, opted for the Heron TP over the Predator drone from the United States. Sources said the Heron TP would be available more quickly and would make for a smoother transition between models.